Dataset Viewer
Auto-converted to Parquet Duplicate
record_id
stringlengths
12
12
facility_id
stringclasses
499 values
country
stringclasses
8 values
commodity
stringclasses
8 values
operational_status
stringclasses
4 values
dam_type
stringclasses
4 values
construction_method
stringclasses
4 values
max_height_m
float64
10
250
current_height_m
float64
5
207
storage_capacity_mm3
float64
0.4
6.94k
current_volume_mm3
float64
0.2
5k
catchment_area_km2
float64
0.5
100
year_constructed
int64
1.96k
2.02k
design_life_years
int64
20
100
last_raise_year
int64
1.96k
2.02k
consequence_classification
stringclasses
5 values
monitoring_date
stringdate
2020-01-01 00:00:00
2024-12-04 00:00:00
freeboard_m
float64
0.69
10
piezometer_level_m
float64
5.01
50
seepage_rate_lpm
float64
0.23
308
settlement_mm
float64
5
380
inclinometer_displacement_mm
float64
0
73.8
rainfall_24h_mm
float64
0
200
earthquake_pga
float64
0
0.19
water_balance_status
stringclasses
3 values
factor_of_safety
float64
0.8
2.36
risk_score
float64
0
75.3
risk_category
stringclasses
4 values
last_inspection_days_ago
int64
1
730
governance_score
int64
20
100
has_eap
bool
2 classes
TSF-0694593D
FAC-0044
south_africa
platinum
inactive
earthfill
downstream
56.939191
35.5
53.2
45.5
6.185094
2,022
25
2,023
high
2022-10-04
1.661706
30.581554
20.885499
20.368661
9.429776
28.5
0.034
deficit
1.21
23.7
low
112
66
true
TSF-36CC50AC
FAC-0386
zambia
iron_ore
active
composite
upstream
43.54391
30.1
47.5
28.8
19.142593
2,017
25
2,023
low
2023-03-11
1.760834
6.648616
2.493209
16.741053
0.417712
145.5
0.011
deficit
1.47
25.3
medium
16
75
true
TSF-0012E477
FAC-0327
mauritania
gold
active
earthfill
upstream
83.189037
55.5
480.9
215.6
11.02752
1,984
30
2,004
significant
2020-11-02
2.802299
40.722245
15.647941
10.414748
11.283311
18
0.011
balanced
1.38
20.5
low
102
59
true
TSF-20FF22A1
FAC-0219
tanzania
copper
closed
rockfill
centerline
45.060151
39
95.2
53
6.739253
1,989
100
1,993
very_high
2023-07-14
3.435633
29.953623
4.065602
34.547783
1.758566
7.9
0.008
deficit
1.55
7.1
low
640
53
true
TSF-B53EEB24
FAC-0216
south_africa
platinum
inactive
earthfill
downstream
84.9396
67.9
299.9
110.6
7.35656
2,018
30
2,022
very_high
2021-12-31
3.851134
39.96795
17.468449
5
15.337724
3.6
0.016
surplus
1.41
7.8
low
56
57
true
TSF-4404FCEA
FAC-0429
south_africa
iron_ore
active
rockfill
centerline
38.396071
27.4
86.9
32.2
7.881385
1,975
25
2,009
low
2020-05-09
1.980291
11.804687
26.660916
21.750535
20.633532
35.6
0.009
deficit
1.4
10.2
low
269
48
true
TSF-D0C42BC9
FAC-0042
mali
other
inactive
rockfill
downstream
56.892828
34.1
200.2
183.3
11.255334
1,995
30
1,998
significant
2022-02-25
2.638594
16.813321
3.479035
24.093653
30.546634
0.7
0.003
balanced
1.61
24.9
low
24
70
true
TSF-479DEBF0
FAC-0348
mali
coal
active
earthfill
centerline
45.414652
32.3
91.1
68.5
7.706218
1,974
30
2,014
high
2021-11-25
1.959546
45.973754
3.18843
16.822954
13.515179
1.4
0.009
deficit
1.38
7.7
low
4
48
true
TSF-78745A34
FAC-0100
drc
platinum
closed
rockfill
centerline
27.243903
16.1
19.4
13.9
6.530151
1,999
20
2,016
low
2023-08-26
1.817218
24.344071
67.925377
38.532539
28.112601
14.4
0.009
balanced
1.67
12.3
low
153
78
false
TSF-77CE4785
FAC-0047
zambia
platinum
inactive
earthfill
centerline
29.275932
28.6
7.2
4.4
2.541201
1,962
30
1,964
low
2021-06-21
3.198071
27.980968
11.691155
44.165402
1.462409
23.1
0.01
deficit
1.74
16.9
low
191
70
true
TSF-7BBC9CFA
FAC-0263
drc
platinum
active
concrete
downstream
26.161338
15.4
16.7
10.3
4.187749
1,973
25
2,004
very_high
2023-10-03
2.63961
33.940784
15.218834
23.653425
0.453664
3.3
0.003
deficit
1.41
1.1
low
176
72
true
TSF-EBA2D71C
FAC-0487
ghana
platinum
active
earthfill
dry_stack
38.833849
36.1
56.3
45.1
9.222086
2,006
30
2,021
significant
2023-09-11
3.261461
28.773205
1.910498
127.852883
52.817476
16.2
0.009
surplus
1.8
24.7
low
126
61
true
TSF-B455D038
FAC-0367
south_africa
gold
active
rockfill
downstream
25.1918
20.3
32
10.7
8.588323
2,003
20
2,023
significant
2023-01-30
2.162621
38.777924
2.669641
11.51117
10.091763
2.7
0.006
surplus
1.13
20.4
low
93
33
false
TSF-3F8C178A
FAC-0380
south_africa
iron_ore
inactive
earthfill
centerline
43.014606
38.9
117.7
86.4
2.251811
1,976
50
2,016
low
2021-10-24
3.553273
15.042695
9.131416
13.866372
11.658077
21.1
0.025
balanced
1.46
9.8
low
17
60
true
TSF-C5F70431
FAC-0358
south_africa
iron_ore
active
rockfill
downstream
42.146049
39.8
23.5
15.5
4.713667
1,972
20
2,016
high
2020-07-28
1.731499
46.437767
5.055096
14.405059
27.526191
6.8
0.01
surplus
1.47
1
low
346
66
true
TSF-1D280BA9
FAC-0393
tanzania
platinum
inactive
earthfill
upstream
37.453212
33.8
85.4
42.6
3.512042
2,009
25
2,011
significant
2021-01-09
2.265579
7.415723
2.705588
49.562574
5.117936
15.1
0.006
surplus
1.36
20.2
low
122
58
true
TSF-96198C5D
FAC-0256
south_africa
diamond
active
rockfill
downstream
37.845467
30.1
69.6
30.6
22.014625
2,021
25
2,021
high
2021-06-24
1.745975
27.477511
9.767779
26.862056
3.709403
3.2
0.001
deficit
1.64
6.1
low
70
77
false
TSF-DDBAFEC0
FAC-0064
south_africa
iron_ore
active
earthfill
downstream
23.577785
14.9
19.5
16.8
9.033199
1,994
50
2,000
high
2022-08-13
3.045933
49.894368
1.338757
5
2.17471
0.7
0.08
balanced
1.57
8.1
low
10
60
true
TSF-FAF2C6A8
FAC-0419
drc
copper
active
earthfill
upstream
27.961098
23.2
38.3
34.7
10.425746
2,005
100
2,021
high
2024-08-08
5.612515
34.645509
10.008885
15.436043
14.146472
5.9
0.009
surplus
1.52
34.8
medium
4
73
false
TSF-35A727F9
FAC-0225
south_africa
gold
active
concrete
downstream
12.153713
6.1
2.1
0.8
7.004995
2,004
25
2,021
very_high
2023-09-29
3.150197
26.697787
3.002551
12.434376
0.563767
15.5
0.011
deficit
1.51
14.9
low
117
54
true
TSF-A665C152
FAC-0250
south_africa
gold
active
earthfill
upstream
30.817367
21.2
24.6
10.1
4.476934
2,016
20
2,016
significant
2024-04-28
2.60992
47.864322
15.008365
77.808876
19.691372
2.8
0.061
surplus
1.09
52.1
high
77
79
true
TSF-82C0CD44
FAC-0185
drc
copper
inactive
earthfill
dry_stack
18.329527
17
12.9
9.5
5.17401
1,972
30
2,022
high
2021-12-07
2.511838
8.509401
8.175647
10.519459
14.387959
8.3
0.034
deficit
2.04
18.3
low
25
83
true
TSF-93E0AE36
FAC-0091
ghana
copper
closed
rockfill
downstream
35.160084
27.8
14.4
11.6
10.959195
1,995
25
2,001
low
2020-04-13
2.155431
24.007122
12.527781
19.823968
25.242654
4.9
0.026
surplus
1.27
25.8
medium
19
55
true
TSF-309A4200
FAC-0463
zambia
gold
active
earthfill
upstream
21.570066
13.6
16.2
10
6.000976
1,969
20
1,995
significant
2024-06-01
4.229437
45.66005
28.215021
5.700218
35.763105
3.9
0.011
balanced
1.12
51.4
high
97
79
true
TSF-541DBA11
FAC-0390
mali
gold
inactive
concrete
centerline
10
9.5
2.7
2.4
11.050424
1,980
25
2,006
high
2024-08-15
3.20519
35.611036
3.789941
22.782808
3.201101
5.8
0
balanced
1.48
4.8
low
18
68
true
TSF-87D3B7A6
FAC-0321
south_africa
gold
active
earthfill
downstream
127.927767
64.9
1,683.3
1,460.2
8.284436
1,986
25
1,990
significant
2023-03-17
1.391788
21.57963
2.776464
90.527889
23.790095
2.1
0.009
balanced
1.27
48.9
medium
101
50
true
TSF-54721BF1
FAC-0201
mali
coal
inactive
composite
centerline
28.822098
27.1
13.4
5.1
9.359918
2,018
30
2,020
significant
2022-05-22
4.200982
48.989978
24.569374
10.315432
5.632223
5.2
0.023
balanced
1.44
14.6
low
11
67
true
TSF-777F3B43
FAC-0411
mali
coal
active
concrete
downstream
78.90422
69.4
399
156.6
9.74979
1,982
30
1,993
high
2020-07-28
1.918948
39.161174
40.152876
42.328004
13.430388
13.9
0.002
surplus
1.19
32
medium
238
71
true
TSF-8074407B
FAC-0272
tanzania
copper
inactive
earthfill
upstream
24.138454
13.8
5.1
1.8
4.850471
1,961
25
1,983
significant
2023-11-07
2.090965
48.979306
26.613354
17.034654
1.722662
7.3
0.008
deficit
1.19
54.5
high
295
39
true
TSF-F5231C8F
FAC-0221
zambia
gold
active
earthfill
upstream
91.731869
48.8
715.2
621.5
5.761879
1,991
25
2,002
low
2024-10-23
3.192856
31.265633
0.718282
19.773362
0.945454
4.9
0.01
balanced
1
43.6
medium
383
54
true
TSF-698FF9BF
FAC-0225
zambia
gold
active
rockfill
centerline
16.593006
16.2
6.1
4
15.288141
1,986
25
2,003
extreme
2022-05-26
2.13978
5.367979
13.490859
32.993052
4.217086
35.5
0.021
balanced
1.6
26.1
medium
149
69
true
TSF-613FCA98
FAC-0113
zambia
gold
inactive
rockfill
centerline
36.804457
19.6
55.2
50.3
31.85163
2,007
50
2,017
high
2023-07-26
6.666734
48.737315
2.903424
7.351411
1.952032
16.5
0.009
surplus
1.53
10.5
low
15
46
true
TSF-69A1130A
FAC-0046
zimbabwe
copper
active
earthfill
centerline
17.195132
17
10.8
8.4
15.400405
1,960
30
1,967
very_high
2020-06-17
2.470926
42.083173
18.099037
10.875939
6.803655
22.6
0.017
surplus
1.27
36.7
medium
30
41
true
TSF-EB22F6F8
FAC-0277
south_africa
gold
active
earthfill
upstream
157.660804
112
1,758.3
1,364.1
0.793625
2,017
50
2,022
high
2021-02-28
3.501749
29.76329
5.73855
9.731162
43.308158
2.6
0.004
deficit
1.04
67.2
high
76
80
true
TSF-A487C109
FAC-0443
mauritania
copper
active
earthfill
centerline
28.515366
19.3
24.6
9.4
4.029337
2,006
100
2,008
significant
2023-01-26
1.46551
12.240103
5.279849
77.688602
23.829025
21.7
0.01
surplus
1.39
12.2
low
18
95
true
TSF-E824966D
FAC-0031
zambia
other
under_construction
rockfill
downstream
54.438495
44.9
114.9
42.6
8.099266
1,997
30
2,013
very_high
2021-07-11
2.124395
44.642207
4.989486
46.686914
4.573787
4.4
0.006
balanced
1.44
8.5
low
41
74
true
TSF-1C7CFB7D
FAC-0429
tanzania
platinum
active
rockfill
centerline
43.395097
32.5
80.6
73
3.069228
2,014
100
2,015
extreme
2020-07-02
2.579603
33.680938
4.055674
44.266578
6.430743
18
0
deficit
1.65
17.1
low
51
62
false
TSF-DE16A48E
FAC-0413
ghana
coal
active
earthfill
upstream
32.612336
22.7
45.9
28.2
2.956275
1,974
25
2,018
very_high
2022-04-29
4.050044
5.136527
2.056242
45.072499
7.838203
4.9
0.003
balanced
1.02
48
medium
349
57
true
TSF-4D25FC5A
FAC-0138
south_africa
gold
closed
rockfill
centerline
45.178979
37.1
114.8
108.6
5.285814
1,985
25
1,997
significant
2023-07-24
1.767409
27.220064
5.040177
38.361754
1.769537
8.3
0.014
balanced
1.69
8
low
74
78
true
TSF-0F440FAF
FAC-0315
drc
gold
inactive
rockfill
dry_stack
74.851321
50.5
62.4
31.8
9.740166
1,978
30
1,978
very_high
2020-02-08
4.39194
49.20428
8.425566
5.48279
13.676253
12.7
0.091
balanced
1.7
15.3
low
40
57
true
TSF-3C0B74A1
FAC-0082
drc
other
active
composite
upstream
49.448096
25.6
72.1
50.8
12.109972
1,977
25
1,981
high
2021-10-10
2.86031
31.369967
32.960054
12.464565
14.478744
36.5
0
balanced
1.2
42.7
medium
324
86
true
TSF-9437C43C
FAC-0379
ghana
copper
inactive
earthfill
centerline
36.505865
33.3
40
26.9
5.507565
2,017
30
2,019
significant
2024-05-29
3.098687
36.982754
12.331922
16.882711
3.861232
3.9
0.002
balanced
1.25
27.3
medium
11
71
false
TSF-C2BC745E
FAC-0350
ghana
platinum
active
earthfill
downstream
45.222455
34.2
26.3
9.1
5.179456
2,016
50
2,023
high
2020-03-28
2.01751
34.612252
5.53076
22.324575
21.056674
29.6
0.04
balanced
1.43
5.3
low
130
76
true
TSF-402AD0A7
FAC-0177
south_africa
other
active
earthfill
upstream
104.482878
88.1
878.8
560
3.762391
1,973
100
1,987
low
2020-05-24
1.847679
28.343249
5.136609
8.902301
11.959133
42.9
0.04
surplus
1.05
44.6
medium
75
74
true
TSF-645DD48E
FAC-0033
drc
platinum
active
rockfill
upstream
25.788116
20.3
19.5
17.6
11.085938
1,975
30
1,999
significant
2024-07-16
1.137747
36.144012
0.373025
6.630137
31.456678
0.2
0.007
surplus
1.31
52.5
high
274
55
false
TSF-ECB91FEA
FAC-0485
ghana
copper
closed
earthfill
centerline
10.888072
8.8
0.4
0.2
10.505636
1,965
50
2,009
extreme
2020-11-04
3.064468
13.809389
4.993367
8.647853
7.390779
10.9
0.003
balanced
1.72
22.6
low
91
83
true
TSF-E26817DE
FAC-0222
mauritania
platinum
closed
earthfill
upstream
17.151736
10.5
8.3
5
15.266126
1,969
30
1,981
low
2022-09-09
3.493493
20.206681
8.451501
10.94879
0.460907
103.3
0.004
balanced
1.72
34.7
medium
314
73
true
TSF-C4E8E825
FAC-0446
south_africa
gold
active
rockfill
upstream
17.934494
17.3
5.6
4.2
8.197277
2,018
30
2,022
high
2022-08-22
2.35195
45.024058
4.008019
14.965576
8.227833
131.9
0.001
surplus
1.28
62.5
high
16
46
true
TSF-45FD8CA3
FAC-0338
ghana
gold
active
rockfill
centerline
19.515953
14.1
12.9
10.4
2.58839
1,972
25
1,993
low
2022-12-17
1.442818
17.143191
4.363438
28.242563
16.110687
5.6
0.064
balanced
1.55
14.7
low
106
48
true
TSF-C0E79613
FAC-0389
south_africa
gold
active
earthfill
downstream
19.922621
19.1
4.7
3.9
5.589495
1,961
30
2,017
low
2023-12-05
2.17614
23.753614
0.617549
17.756474
1.796657
13.5
0.003
deficit
1.54
6.3
low
78
32
true
TSF-CBCB4978
FAC-0379
drc
diamond
active
earthfill
centerline
32.64985
29.5
6.2
3.7
14.666055
2,015
25
2,021
very_high
2023-03-10
3.155797
9.652164
1.839533
53.237924
4.759207
2.7
0.002
surplus
1.85
9.6
low
405
63
true
TSF-E82CBB91
FAC-0097
drc
iron_ore
active
earthfill
downstream
38.415106
33
16.5
9.7
1.843408
2,007
50
2,012
very_high
2024-08-16
2.92593
46.872025
2.459245
33.009078
12.417707
14.3
0.024
deficit
1.5
9
low
41
62
true
TSF-0A90648C
FAC-0181
zambia
gold
inactive
earthfill
downstream
38.168212
27.9
45.3
27.5
6.904252
2,004
20
2,013
significant
2023-02-24
3.556532
17.119527
3.585416
15.659379
18.629819
140.5
0.007
surplus
1.32
22.1
low
30
79
true
TSF-C875C93E
FAC-0233
mauritania
gold
active
earthfill
centerline
21.366692
10.9
16.6
15.4
9.282402
1,969
50
2,016
extreme
2020-07-26
1.423384
31.143461
0.3533
28.771019
8.481744
5.4
0.005
balanced
1.46
24.2
low
27
91
false
TSF-B33F04C4
FAC-0248
south_africa
iron_ore
closed
earthfill
upstream
60.119848
39.5
182.9
165.3
36.706356
1,961
30
1,984
high
2022-12-13
2.311736
22.944727
6.111306
18.490792
32.289752
53.1
0.052
surplus
1.04
64.8
high
21
73
true
TSF-FC1FD683
FAC-0021
zimbabwe
uranium
active
earthfill
upstream
45.634933
38
16.2
11.4
4.56815
2,001
20
2,013
low
2020-01-28
2.611524
20.602527
6.752576
12.534479
12.942258
3.1
0.022
surplus
1.64
28
medium
57
38
true
TSF-7FCC7A30
FAC-0273
south_africa
gold
active
concrete
downstream
85.522986
56.9
433.9
210.4
6.703692
1,995
50
2,019
high
2021-11-18
3.501738
12.568974
11.144343
21.049621
2.890588
4.9
0.001
surplus
1.59
19
low
37
74
true
TSF-476F7428
FAC-0077
south_africa
copper
active
concrete
dry_stack
55.039804
30.2
121.7
107.7
28.505054
1,971
30
1,979
high
2023-06-12
2.135389
49.821092
4.807083
27.995169
29.387262
11.6
0.025
surplus
2
14.7
low
44
57
false
TSF-DC30BD38
FAC-0371
drc
diamond
inactive
earthfill
downstream
26.850406
20.4
31
12.7
4.615138
1,988
50
2,018
very_high
2024-09-24
3.366791
18.013471
16.856405
44.825372
3.120031
6.4
0.034
balanced
1.35
14.2
low
1
67
false
TSF-DB2808B8
FAC-0341
south_africa
diamond
active
rockfill
dry_stack
72.478719
41.8
150.1
55.4
17.457417
2,016
20
2,022
significant
2021-05-01
1.859388
22.83927
44.010291
117.244135
17.246752
0.5
0.009
balanced
1.9
8.6
low
26
86
true
TSF-D3C3C84C
FAC-0461
zambia
uranium
active
earthfill
centerline
39.023017
25.5
72.1
41.1
10.116103
2,016
25
2,020
low
2020-06-22
2.964767
13.672817
1.808222
55.614516
8.895171
12
0.007
surplus
1.47
4.3
low
63
53
true
TSF-8DE0D9EA
FAC-0372
zambia
gold
active
concrete
downstream
53.452167
40.1
141.7
105.6
6.19158
1,963
50
1,977
low
2020-08-26
2.417446
33.240903
2.121537
9.041789
4.182156
1.1
0.009
balanced
1.13
33.4
medium
3
44
true
TSF-290214DB
FAC-0183
zimbabwe
gold
inactive
concrete
downstream
51.022047
28.5
124.6
41.6
10.604662
1,962
30
1,970
extreme
2021-12-30
2.361743
8.877736
10.330133
5.604215
10.427474
66.6
0.049
surplus
1.26
55.7
high
25
64
false
TSF-F9285AFE
FAC-0483
drc
copper
closed
rockfill
upstream
30.735185
17.1
24.7
12.4
6.566563
1,979
25
2,013
extreme
2020-01-08
7.13674
34.832506
13.277466
56.53965
2.132372
20.6
0.007
balanced
1.36
30.7
medium
201
42
true
TSF-D32140E9
FAC-0205
zambia
gold
active
rockfill
downstream
35.232263
21.3
8.3
6.7
44.981501
2,007
30
2,013
low
2021-07-30
2.379391
27.638929
2.184051
18.186486
7.235561
28.4
0.021
balanced
1.98
1.6
low
34
63
true
TSF-414A3CA6
FAC-0162
ghana
diamond
active
earthfill
upstream
30.605362
24.4
14.1
10.3
1.415602
2,009
25
2,017
low
2024-10-01
2.295332
34.136832
39.91855
11.434603
25.7297
7.3
0.014
balanced
1.48
34.2
medium
111
66
true
TSF-E2590298
FAC-0452
south_africa
gold
active
earthfill
downstream
19.85056
19.2
15.3
5.4
5.894541
1,992
100
1,994
very_high
2021-10-11
1.537479
5.210997
2.878993
74.090288
3.383875
26.7
0.045
balanced
1.63
18.2
low
371
39
true
TSF-98CC9FFD
FAC-0185
south_africa
platinum
active
earthfill
upstream
10
6.2
2.1
0.9
6.034391
1,995
25
2,009
very_high
2023-08-13
4.039169
35.306821
5.782036
17.282159
5.191209
1.5
0.019
deficit
1.6
32.9
medium
1
55
false
TSF-C7768953
FAC-0038
zambia
uranium
under_construction
earthfill
dry_stack
21.839422
18.8
14
10.8
6.637968
1,989
30
1,991
high
2020-09-30
2.187063
7.055514
14.403587
18.385243
2.667726
2.4
0.025
balanced
1.68
7.3
low
36
80
false
TSF-9154477F
FAC-0234
mauritania
other
active
rockfill
downstream
37.318881
22.2
49.5
18.6
17.537469
1,986
25
2,006
high
2021-09-09
2.683672
46.28742
31.033587
12.04868
5.850262
30.4
0.002
balanced
1.62
9.3
low
109
86
true
TSF-05B1FE05
FAC-0397
south_africa
iron_ore
inactive
earthfill
downstream
63.519753
51.9
55.2
16.9
5.167405
1,967
25
2,014
significant
2022-04-30
1.939218
40.704065
2.730266
5
1.255379
19.2
0.026
balanced
1.27
24.7
low
245
84
true
TSF-78DA445B
FAC-0094
drc
other
closed
earthfill
downstream
53.388427
30.4
87.2
82.4
10.953205
1,987
30
2,023
very_high
2022-12-12
3.210076
10.575634
15.502203
9.601392
5.454391
35.8
0.037
surplus
1.5
13.9
low
119
82
true
TSF-CB013A7A
FAC-0231
zimbabwe
gold
inactive
rockfill
upstream
28.000774
25.8
27.7
19.4
8.892189
2,022
20
2,023
significant
2022-08-30
3.946899
30.031853
6.62067
12.075798
6.115653
12.9
0.019
deficit
1.16
54.3
high
19
69
true
TSF-44536817
FAC-0064
tanzania
copper
active
rockfill
downstream
22.018742
19.2
4.9
2.8
14.451254
1,991
25
2,010
very_high
2024-05-21
4.588057
48.058695
1.702817
5.409178
14.795595
35.5
0.003
surplus
1.68
2.6
low
180
41
true
TSF-707D1AE4
FAC-0343
drc
gold
inactive
rockfill
centerline
29.727587
25
45.4
31.2
6.62105
1,997
30
2,017
very_high
2024-10-05
2.594406
15.917949
4.004322
21.406809
6.496305
25.7
0.009
surplus
1.09
32.2
medium
42
76
true
TSF-AC4D2864
FAC-0237
zambia
other
active
rockfill
downstream
18.448741
9.4
2.5
1.8
9.561703
2,022
30
2,022
high
2024-06-29
2.143891
8.270961
2.215382
24.86546
12.09775
49.4
0.001
surplus
1.3
9.7
low
45
62
true
TSF-2FE14D20
FAC-0165
zimbabwe
uranium
active
concrete
downstream
10
9.2
2.3
1.4
6.694245
1,961
100
2,004
extreme
2023-09-12
2.088767
24.01375
14.617056
41.58746
34.610044
186.9
0.016
balanced
1.79
35.5
medium
299
30
true
TSF-0C2AE447
FAC-0113
tanzania
gold
under_construction
earthfill
centerline
13.103944
7.5
2.3
1.7
3.357367
2,002
30
2,023
significant
2022-08-20
2.737542
11.219359
1.778787
10.964469
31.853467
0.6
0
balanced
1.7
22
low
23
70
true
TSF-BB7BD14A
FAC-0282
south_africa
gold
active
rockfill
upstream
75.553787
57.9
441.5
335.8
26.555296
1,976
20
1,983
extreme
2023-05-09
3.008542
39.989552
11.424375
5
0.865247
1
0.028
surplus
1.32
42
medium
22
63
true
TSF-A01BFF75
FAC-0334
mali
copper
active
earthfill
centerline
100.924321
89.7
876.1
365
4.015865
1,990
20
1,999
very_high
2024-08-16
3.379455
46.046711
7.270069
15.454939
3.338338
4
0.002
balanced
1.6
5.3
low
44
66
true
TSF-9DE2237F
FAC-0470
south_africa
gold
active
earthfill
upstream
52.058318
42.5
79.3
45.6
5.039011
1,960
30
2,023
significant
2023-04-05
1.937242
25.232301
10.288969
7.383088
0.501959
2.3
0.006
balanced
1.36
34.8
medium
130
52
true
TSF-C9748C83
FAC-0218
tanzania
coal
active
composite
centerline
31.979927
29.1
30.3
15.1
3.723046
1,980
25
2,000
high
2023-09-26
2.868422
49.905879
7.34539
19.665862
1.416619
8.7
0.005
balanced
1.97
15.9
low
64
52
true
TSF-02C34C96
FAC-0080
south_africa
gold
inactive
earthfill
dry_stack
14.356629
12.3
7.6
6.2
10.192143
1,994
25
2,015
high
2023-02-17
1.808133
13.55384
3.05623
40.209544
12.627118
3.5
0.001
balanced
1.85
5.2
low
103
67
true
TSF-E495D3E9
FAC-0416
south_africa
coal
closed
earthfill
centerline
30.06377
26.4
32.5
26
5.04033
1,991
100
2,018
very_high
2022-09-11
2.581063
46.299788
10.764255
13.140027
15.430562
23.1
0.039
balanced
1.59
2.8
low
38
61
false
TSF-056C1FCB
FAC-0314
south_africa
platinum
inactive
earthfill
upstream
47.803724
31
16.9
14
24.833504
1,984
50
2,022
low
2022-01-16
4.750489
19.556621
8.3576
18.964636
5.4755
32.8
0.022
balanced
1.2
39.5
medium
160
61
true
TSF-23CAC661
FAC-0350
ghana
copper
active
composite
downstream
54.485181
37.6
177.7
103.8
11.326674
2,018
25
2,018
low
2021-11-17
2.481322
45.584926
4.385991
5
17.349374
4.7
0
balanced
1.52
16
low
212
50
true
TSF-C106023F
FAC-0048
ghana
gold
active
concrete
centerline
50.06322
37.6
76.5
51.6
5.921107
1,973
20
1,991
high
2021-11-25
1.908267
45.70147
95.202387
14.713098
5.7478
14.3
0.01
surplus
1.22
24.9
low
134
46
true
TSF-442BB9B0
FAC-0156
south_africa
other
active
earthfill
downstream
68.425177
54.3
136.8
103.8
3.568694
1,973
50
1,984
significant
2024-08-13
3.127404
20.699232
2.251638
72.495063
1.856219
37.2
0.001
balanced
1.55
6.2
low
6
54
true
TSF-12014759
FAC-0383
drc
platinum
active
rockfill
downstream
106.247509
89.9
1,001.9
510.3
6.762784
1,996
30
2,018
significant
2020-09-23
3.887572
5.912725
12.185565
31.38674
7.142316
16.7
0.028
balanced
1.59
2.5
low
32
76
true
TSF-C6A1E84E
FAC-0416
ghana
copper
closed
earthfill
downstream
25.971157
20.2
33.8
31.6
11.201239
1,981
25
2,018
low
2020-12-16
1.998668
18.618113
13.29783
10.750079
3.288545
1.8
0.006
balanced
1.56
14
low
13
75
true
TSF-AFC3C504
FAC-0217
zimbabwe
copper
inactive
rockfill
upstream
178.25003
152.4
670.5
366.2
7.122738
1,977
30
2,017
low
2022-01-26
1.580903
24.63501
5.510591
8.182608
1.975102
15.7
0.004
deficit
1.55
24.4
low
33
38
true
TSF-767620F4
FAC-0402
mali
uranium
closed
earthfill
downstream
10
5.8
1.4
0.9
6.604269
1,964
50
1,971
high
2022-09-06
1.96444
49.271366
9.423789
19.679828
1.435485
16.7
0.063
balanced
1.78
14.8
low
87
65
true
TSF-483BF0E9
FAC-0420
zambia
coal
closed
earthfill
upstream
20.75969
14.5
7
5.9
3.26619
1,992
20
2,013
high
2020-08-24
2.279883
36.037258
11.490776
30.177288
5.793518
2.2
0.008
balanced
1.59
21.9
low
2
55
true
TSF-622315EB
FAC-0193
south_africa
coal
active
rockfill
downstream
37.337573
35.7
78.5
61.7
44.456791
1,999
50
2,011
low
2020-08-27
4.989102
33.56817
6.832972
10.870359
1.158131
19.5
0.002
surplus
1.27
37.6
medium
73
95
true
TSF-E593AD0F
FAC-0449
south_africa
platinum
inactive
composite
downstream
46.035625
28
128.5
80.4
6.290943
1,995
50
2,016
high
2021-08-10
1.550201
34.033116
4.208525
17.198784
30.134904
9.4
0.036
balanced
1.67
23.9
low
46
53
true
TSF-179CB004
FAC-0144
mali
diamond
inactive
earthfill
upstream
29.696186
17
44.4
25.1
2.460553
2,008
30
2,010
high
2020-08-28
1.38034
22.83186
6.791456
5
10.10828
2.9
0.004
surplus
1.42
36.7
medium
125
51
true
TSF-78992CFC
FAC-0119
south_africa
gold
under_construction
earthfill
upstream
24.594933
21.5
4.2
3
3.126651
2,001
100
2,003
extreme
2023-12-15
3.030613
36.033251
4.014115
38.481631
16.44342
179.7
0.007
deficit
1.49
44.6
medium
126
52
true
TSF-FADA76D3
FAC-0341
ghana
iron_ore
active
composite
dry_stack
124.157541
74.1
252.8
147.4
5.610938
1,999
25
2,007
very_high
2020-04-17
2.044767
17.585196
29.003797
10.124578
10.251875
12.9
0.024
surplus
1.76
0.8
low
247
84
true
TSF-3BFB851F
FAC-0318
mali
copper
inactive
earthfill
downstream
23.900191
17.4
16.9
11.6
35.016546
1,979
50
1,994
very_high
2024-02-14
1.82838
38.8534
17.660222
33.352067
5.015066
26.6
0.004
surplus
1.52
2.5
low
417
38
true
TSF-B9816502
FAC-0069
mauritania
platinum
active
earthfill
downstream
17.964105
15.4
3.5
2.9
6.447407
2,011
30
2,021
extreme
2021-07-12
3.525021
34.332681
7.940827
26.542401
2.228895
5.3
0.006
surplus
1.35
18
low
1
48
false
End of preview. Expand in Data Studio

African Tailings Dam Risk Dataset

Dataset Description

Overview

This dataset provides synthetic monitoring records and risk assessments for tailings storage facilities (TSFs) across African mining operations. Tailings dams represent one of the most significant environmental and safety risks in mining, with catastrophic failures causing loss of life and long-term environmental damage.

The dataset captures dam characteristics, geotechnical monitoring data, environmental conditions, and risk indicators aligned with the Global Industry Standard on Tailings Management (GISTM).

Dataset Statistics

Attribute Value
Records 5,000
Variables 31
Temporal Coverage 2020-2024
Geographic Scope 8 African countries
Facility Count ~500 unique TSFs
Format CSV, Parquet

Data Schema

Variable Dictionary

Variable Type Description Value Range/Categories
record_id string Unique monitoring record ID TSF-XXXXXXXX
facility_id string Tailings facility identifier FAC-XXXX
country categorical Country of facility south_africa, ghana, drc, zambia, zimbabwe, tanzania, mali, mauritania
commodity categorical Primary commodity gold, copper, platinum, iron_ore, coal, diamond, uranium, other
operational_status categorical Facility status active, inactive, closed, under_construction
dam_type categorical Dam construction type earthfill, rockfill, concrete, composite
construction_method categorical Raise method (critical for stability) upstream, downstream, centerline, dry_stack
max_height_m float Maximum design height 10-250 meters
current_height_m float Current embankment height meters
storage_capacity_mm3 float Total storage capacity million m³
current_volume_mm3 float Current stored volume million m³
catchment_area_km2 float Contributing catchment area km²
year_constructed integer Initial construction year 1960-2023
design_life_years integer Designed operational life 20-100 years
last_raise_year integer Year of most recent raise Year
consequence_classification categorical Failure consequence class extreme, very_high, high, significant, low
monitoring_date datetime Date of monitoring record 2020-01-01 to 2024-12-31
freeboard_m float Water surface to crest distance 0.5-10 meters
piezometer_level_m float Phreatic surface height meters
seepage_rate_lpm float Measured seepage rate liters per minute
settlement_mm float Cumulative crest settlement millimeters
inclinometer_displacement_mm float Lateral displacement millimeters
rainfall_24h_mm float 24-hour precipitation millimeters
earthquake_pga float Peak ground acceleration g (gravitational)
water_balance_status categorical Water management status surplus, balanced, deficit
factor_of_safety float Calculated stability FoS 0.8-2.5
risk_score float Composite risk score 0-100
risk_category categorical Risk classification low, medium, high, critical
last_inspection_days_ago integer Days since last inspection 1-730 days
governance_score integer Management system score 20-100
has_eap boolean Emergency Action Plan exists True/False

Methodology

Tailings Dam Risk Framework

The dataset models risk factors identified in major tailings dam failures and GISTM requirements:

Construction Method Risk Ranking:

Method Risk Level Prevalence Notes
Upstream Highest 35% Sequential raises on tailings beach; liquefaction vulnerable
Centerline Medium 25% Raises vertically; moderate stability
Downstream Lower 30% Raises downstream; best stability
Dry Stack Lowest 10% Filtered tailings; no impoundment

Key Risk Indicators Modeled:

  1. Factor of Safety (FoS): Ratio of resisting to driving forces

    • Critical threshold: FoS < 1.3
    • Upstream dams: Mean FoS reduced by 0.2
    • Dry stack: Mean FoS increased by 0.3
  2. Freeboard: Buffer against overtopping

    • Critical threshold: < 1.5 meters
  3. Seepage: Indicator of internal erosion

    • Warning threshold: > 100 LPM
  4. Displacement: Slope movement indicator

    • Warning threshold: > 30 mm cumulative

Historical Context

Major African tailings incidents informing risk modeling:

  • Merriespruit (South Africa, 1994): 17 fatalities, upstream dam
  • Samarco analogs: Liquefaction failure modes
  • Regional seismicity considerations

Sensor Correlation Structure

Monitoring parameters are correlated to reflect realistic failure precursors:

  • Rainfall → Piezometer rise → Seepage increase → Settlement/displacement
  • Seismic events → Pore pressure spike → Stability reduction

Limitations

  1. Simplified Geotechnics: Complex soil mechanics reduced to statistical distributions
  2. Sensor Density: Real TSFs have hundreds of instruments; dataset simplified
  3. Failure Events: Actual failures not explicitly modeled (rare events)
  4. Site Specificity: Generic African context; site investigations required
  5. Climate Projections: Historical patterns; climate change effects not modeled
  6. Governance Proxies: Management quality simplified to single score

Ethical Considerations

  • Public Safety: Tailings failures can kill hundreds and devastate communities
  • Environmental Justice: Downstream communities often marginalized
  • Corporate Accountability: Dataset should not be used to obscure real risks
  • Regulatory Implications: Not a substitute for proper engineering assessment
  • Transparency: Supports calls for public disclosure of TSF risks

Intended Uses

Appropriate Uses

  • Development of early warning algorithms
  • Research on risk indicator correlations
  • Educational demonstrations of dam safety monitoring
  • Benchmarking ML approaches for anomaly detection
  • Policy research on tailings governance

Inappropriate Uses

  • Actual dam safety assessments
  • Regulatory compliance certification
  • Insurance or liability determinations
  • Investment decisions on specific facilities
  • Replacing qualified geotechnical engineering

Citation

@dataset{electric_sheep_africa_tailings_dam_2024,
  title = {African Tailings Dam Risk Dataset},
  author = {Electric Sheep Africa},
  year = {2024},
  publisher = {Hugging Face},
  url = {https://huggingface.co/datasets/electricsheepafrica/african-mining-tailings-dam},
  note = {Synthetic dataset for tailings dam risk research aligned with GISTM}
}

References

  1. ICOLD (International Commission on Large Dams). (2001). Tailings Dams: Risk of Dangerous Occurrences. Bulletin 121.

  2. Global Tailings Review. (2020). Global Industry Standard on Tailings Management (GISTM). ICMM, UNEP, PRI.

  3. Santamarina, J.C., Torres-Cruz, L.A., & Bachus, R.C. (2019). Why coal ash and tailings dam disasters occur. Science, 364(6440), 526-528.

  4. Bowker, L.N., & Chambers, D.M. (2015). The risk, public liability, & economics of tailings storage facility failures. Earthwork Act.

  5. Franks, D.M., et al. (2021). Tailings facility disclosures reveal stability risks. Scientific Reports, 11, 5353.

License

This dataset is released under the Creative Commons Attribution 4.0 International License (CC-BY-4.0).

Contact

For questions or feedback, please open an issue on the dataset repository or contact Electric Sheep Africa.

Downloads last month
13

Collection including electricsheepafrica/african-mining-tailings-dam